Specifications include, but are not limited to: Work includes restoration/replacement of existing wood windows, window transoms, sashes, frames, trim, casing, hardware, stools, sills and/or any related elements. Work shall include preparation and painting of existing restored wood windows. The Contractor shall photograph and properly label each of the existing window blinds prior to commencement of the work. The contractor shall remove existing window blinds and turn them over to the Metro for cleaning. The Contractor shall receive the cleaned blinds from the Metro, inventory and re-install the blinds into their original locations at the completion of the work and prior to Substantial Completion. Coordinate with the Metro and existing conditions. Provide all necessary shims, blocking, hardware, tools or equipment as may be necessary to properly install the blinds, in their fully functional condition, into the restored window openings on the interior. Majority of the work shall be performed from the exterior of the building. Contractor shall be responsible for weather-proofing openings where windows may be removed for restoration. Contractor shall be responsible for securing the building against vandalism and maintaining the building secure, weather-tight condition at all times.