1. Prior to commencing site preparation or working access road to wellsite, contractor must contact landowner and operator, as identified by the Division, to discuss the work plan and address any areas of owner concern regarding ingress/egress of equipment or other impacts. (If any well site is in a cropland area, contractor site work must plan to work around their crop planting and harvest schedules to avoid damage.) 2. Contractor is encouraged to make reasonable accommodations to the landowner during site work/access road construction. 3. Attachment J provides project requirements for site preparation, revegetation, reclamation, and Best Management Practices for stable site drainage with erosion prevention and sedimentation controls. 4. Construction of access road should include water bars, ditches or culverts (as necessary) and any other best management practice deemed necessary by the Inspector. (Any cleared brush shall be windrowed, legally burned, or hauled away for proper disposal – depending upon landowner preference.) 5. Site preparation shall include identifying surface waterways and potential conduits to groundwater (i.e. sinkholes) and then implementing best management practices to prevent groundwater degradation. 6. Contractor shall construct a temporary pit, and install a minimum 6-mil liner for fluids containment. 7. Contractor shall disconnect all wellhead connections to flowlines, meters, separators or tanks (without creating leakage or spillage) and permanently secure all buried lines 24 inches below ground level by placement of bull plugs...