Except as specified herein, perform all work in accordance with the Department's 2019 Standard and Supplemental Specifications, Special Notes and Special Provisions, and 2020 Standard and Sepia Drawings, current editions. Article references are to the Standard Specifications. Furnish all equipment, labor, materials, and incidentals for the following work items: (1) Site preparation and erosion control; (2) Guardrail and Terminal Sections; (3) Delineators for guardrail; (4) Dense Graded Aggregate; (5) Cribbing and Geotextile Fabric; (6) Maintain and control traffic; and (76) All other work specified as part of this contract. II. MATERIALS Except as specified herein, provide for all materials to be sampled and tested in accordance with the Department's Sampling Manual and make the materials available for sampling a sufficient time in advance of the use of the materials to allow for the necessary time for testing. A. Maintain and Control Traffic. See Traffic Control Plan. B. Guardrail. Furnish guardrail system components according to section 814 and the Standard and Sepia Drawings, except use steel posts only, no alternates. C. Delineators for Guardrail. Furnish bi-directional white Delineators for Guardrail according to the Standard Drawing RBR-055-01. D. Dense Graded Aggregate. Furnish Dense Graded Aggregate (DGA) according to Section 302.02. Do not furnish Crushed Stone Base in lieu of DGA. E. Erosion Control. See Special Notes for Erosion Control. F. Cribbing. Furnishing new. or used, guardrail elements, straight and structurally sound, and rust free. G. Class 1 Geotextile Fabric. See Section 843.06. III. CONSTRUCTION METHODS A. Maintain and Control Traffic. See Traffic Control Plan.