Specifications include, but are not limited to: Up to approximately 5.5 acres of total disturbance, and consists of actions to reclaim a landslide threatening to block Peter Fork and close Walters Road with either slide material or overflow/flooding from Peter Fork. Proposed reclamation actions include stripping the unstable landslide area to rock and the installation of subdrain along the contour mine bench located immediately above the landslide in order to collect water from the mine bench and direct it into the stripped area in order to help prevent other portions of the outslope below the bench from becoming destabilized by excessive drainage. All excavated earthen material will be placed in a fill area that was previously utilized under the Mike King Slide HighPriority AML Reclamation Project.