Primary Project Objectives • Safely drain the reservoir and permanently breach the dam to prevent impoundment. Project Tasks • Data Collection and Review – Review files associated with the dam. KDOW will provide access to the files for the dam. Coordinate with Kentucky Department of Parks for information. • In-Depth Field Inspection – Perform a detailed engineering inspection of the dam to document the current condition. Provide a stamped inspection report to KDOW detailing observations made. • Survey – Perform a topographic survey of the dam. Provide information in digital format, including a 3- dimensional terrain surface. • Hydrologic & Hydraulic Analyses – Perform any necessary H&H analyses to determine proper sizing of the breach. • Develop Drawings and Specifications – Develop drawings and specifications for construction. Include a construction cost estimate and required documents for bidding. • Reporting – All results of the above assessments are to be provided to KDOW in report form with all digital supporting data. Deliver report(s) and drawing(s) as drafts for KDOW review and comment prior to issuing final report(s). • Project Management – Provide project management for the project including the following: monthly progress meetings, kick-off meeting with KDOW at the start of the project, bid support, construction management, and final project close out meeting.