This project will generally consist of improvements to the existing HVAC systems for Building 30 and 31 within the Nursing Facility. Work includes excavation and asphalt repairs, removal and replacement of existing ceiling systems, modifications to the existing sprinkler system, removal of existing two-pipe HVAC systems, removal of exhaust systems, installation of four-pipe fan coils, installation of outside air systems, installation of exhaust air systems, installation of hot water and chilled water piping systems. removal of power connections to mechanical systems noted, installation of new power panels, and power connections to new equipment. There will be an alternate for these improvements to Building 32. Trades involved shall include but are not limited to: demolition, concrete, drywall, painting, ceilings, fire protection, mechanical, ductwork, electrical, and fire alarm