TECHNICAL SPECIFICATIONS 4.1 Description of Services The bidder shall provide the following services: Service Description: Repairs to the Henderson, Kentucky Fire Department Burn Room Service Location(s): 1131 5th Street, Henderson, Kentucky 42420 Services shall be performed as required to meet the operational needs of the Fire Department. 4.2 Performance Standards All repairs shall: Restore the burn room to a safe and usable condition Be suitable for continued training use Meet applicable codes, standards, and safety requirements 4.3 Equipment, Materials, and Supplies Unless otherwise stated, the bidder shall furnish all equipment, materials, supplies, and tools necessary to perform the services. All equipment and materials shall be suitable for the intended use and maintained in safe working condition. 4.4 Coordination The bidder shall coordinate all work with the Fire Department. Access to the facility shall be as directed by the City. 4.5 Inspection and Acceptance All work is subject to inspection by the City and Fire Department. 4.6 Compliance with Specifications Submission of a bid certifies that the bidder understands and agrees to comply with the Technical Specifications as stated herein. 4.7 Scope of Services Henderson Fire Department (HFD) is seeking bids for repair and replacement of the burn room ceiling located at the HFD Training Grounds, 1131 5th Street, Henderson, KY 42420. These repairs are to be made in response to the inspection report provided to HFD by Collins Engineers, Inc. on February 18, 2025. The report states, “The ceiling of the burn room exhibited areas of moderate warping.” Their recommendation was replacement of the ceiling in the burn room and replacement of insulation as needed. 1. Remove entire stainless steel, 8’x12’ ceiling in training facility burn room. 2. The metal that is removed from the ceiling will be left on site for future use and will not go with the contractor. 3. Upon removal of the ceiling, Division Chief Casey Howard (HFD) will determine if the insulation needs to be replaced. 4. If the insulation is to be replaced, work on the ceiling will be postponed until HFD replaces the insulation. Work would restart after roughly 10 days. 5. If the insulation does not have to be replaced the ceiling installation may continue immediately. 6. Install a new ceiling of 3/16” flat steel sheets. 7. The 3/16” flat steel sheets will be reinforced and held in place by welding ¼” thick, 2”x2” tubing on the bottom side of the new ceiling. The tubing will be welded to the ceiling panels in approximately a 20 ¾ x 23 3/8 on center (oc) grid pattern. The diagram on the next page shows the approximate layout of the grid pattern. The 16”x16” vent must remain accessible and in working order. The new ceiling should not have any exposed bolts or screws. 8. All welds must be structurally sound and will be made by a certified welder. 9. All exposed material will be ground smooth for appearance and safety.