Specifications include, but are not limited to: Reclamation work consists of removing approximately 500 cubic yards of slide material, installing a 12' tall, 70 L.F. long reinforced concrete wall. Subdrains and Concrete Block Tied-Mat drainage systems will also be constructed. Temporary access will be through the existing roadway stone driveway. The waste material generated during project work will be taken to a waste area off of US 119 (see the attached project and site maps). During the process of these construction activities, trees over 5 inches in diameter at breast height will have to be removed in the AML problem area and to install drainage controls. A sediment and erosion control program, consisting of such measures as constructing hay bales/silt fence to be maintained throughout the life of the project and prompt re-vegetation using agricultural limestone, fertilizer, seed, and mulch will be implemented on all areas disturbed by this project.