Specifications include, but are not limited to: This project involves removing Grow Hall, the primary food service facility on the campus, from the central steam heating system and replacing steam service with an independent heat source. The heating in the building is currently provided from two steam convertors and a steam duct coil, which shall be demolished, along with two hydronic heating pumps and a condensate return unit. They will be replaced by one new high-efficiency, condensing, natural gas, hot water boiler, with onboard controls, one new hot water heating coil and three new pumps, with all required accessories. Existing gas line will be demolished, and a new, larger gas line will be run from an existing regulator on the outside wall to the new boiler with existing branches re-welded to the new main. Condensing boiler exhaust vent and combustion air lines will be run to an outside wall.