The project is located at the site of the Peracetic Acid Chemical Feed System at Bells Lane WWTF, 3401 Joint Venture Lane, Louisville, KY 40211. The principal features of the Work to be performed under this Contract include, but are not limited to the following: Replacement of the existing two (2) cross-linked high-density polyethylene storage tanks with two (2) 4,400 gallon double-wall stainless steel tanks suitable for the storage of 15% PAA solution. Construction of a structure to shield the storage tanks from direct exposure to sunlight and provide passive ventilation. Replacement of other components of the chemical storage and feed system with equipment and materials suitable for PAA contact that were damaged during the incident in August 2023. Furnishing of a tank flushing system using the potable water system at the site.