S1 Alumni Coliseum Renovation BP3 - Base Bid 1 Alumni Coliseum Renovation BP3 - Base Bid S2 Alumni Coliseum Renovation BP3 - Alternate One 1 Alternate 1: HYDROTHERAPY FIT-UP ALTERNATE Base bid scope includes no work at hydrotherapy suite. In hydrotherapy additive alternate. Shell space to be built-out with equipment storage room, restroom, and hydrotherapy room with (2) hydrotherapy tubs. Interior storefront to be installed between the hydrotherapy room and existing physical therapy suite. Prep gravel area for new slab per structural. Refer to MEP for new plumbing for restroom and tubs. Refer to structural for slab demo at sump location. See sheet a101.1 for scope of work. S3 Alumni Coliseum Renovation BP3 - Alternate Two 1 Alternate 2: LOADING DOCK CANOPY ALTERNATE Base bid scope includes no work at existing loading dock. In loading dock canopy additive alternate, new canopy and structure to be constructed. See a202 and a203. Refer to structural for framing and MEP drawings for lighting and other equipment. S4 Alumni Coliseum Renovation BP3 - Alternate Three 1 Alternate 3: SOUTH CONCOURSE STOREFRONT ALTERNATE Base bid scope includes no work at south concourse level storefront and entries. In the South Concourse storefront additive alternate, existing storefront to be demolished. See Structural for slab work. New storefront S5 Alumni Coliseum Renovation BP3 - Alternate Four 1 Alternate 4: WAYFINDING AND BRANDING ALTERNATE Base bid scope includes no branding or wayfinding, alternate scope includes wayfinding and branding allowance as per the specifications.