Specifications include, but are not limited to: Remove mineral build up on current well casing and screen Chlorinate well Flush with fresh water Rehab surging/baling to remove sediment at bottom of well Install 10” belled 160/LB. liner and screen Phase 2 Install New Pump and Motor Install pump and motor. 10hp, single phase, 230-volt motor with a GOULDS Water Technology 150H10 Hi-Lo submersible pump or equivalent. This is a 6” submersible pump and should be able to operate up to 200 GPM. Pump should also run on less than 100amps. Install approximately 150’ of 3” x 21’ jointed black T & C pipe Install approximately 160’ of 6-4 flat double jacket wire Install 10hp control box Install 3” check valve Install 3” x 24” well plate