Specifications include, but are not limited to: New water service will consist of approximately 2,000 feet of water line installed in a loop style system to provide water to 24 trailer sites. Once water line is attached to main water line to the area valves, will be installed to shut water down to whole loop system. Drain back valve system will be installed allowing water to be drained from the water line in the off season winter months. Water shall be drained into sewer lift station pit. All new water line will be one (1) inch CTS Poly Pipe. All water lines brought/teed to each trailer site will be one (1) inch and will not be reduced. At each trailer site water service will be one (1) inch ball valve with a ¾ hose fitting attached to existing 4x4 post.