Specifications include, but are not limited to: It is the intent of this specification to provide for the purchase of new equipment to be used by the Hutchinson Fire Department (HFD). The system shall be installed, piped, and electrically wired. #1 1 Vehicle Exhaust Removal System Station #3 #2 1 Vehicle Exhaust Removal System Station #5 #3 12 Tailpipe Modifications Station #3 & 5 #4 1 Vehicle Exhaust Removal System Station #7 #5 6 Tailpipe Modifications Station #7 1. Vehicle Exhaust Removal System NFPA 1901 Compliant to Include: a. Magnetic grabber, High Temp hose assembly, safety disconnect b. Sliding Balancer Track for vehicles c. Straight rail system d. End stop w/hydraulic brake e. 24” square leg extrusion f. Side bracket kit medium 30” g. 5 hp. TEV fan. 208-230V, 1 phase fan. 10” diameter inlet h. May use existing duct work if compatible with new system. i. Control Box for 5hp fan: wireless transmitters. Wireless receiver j. Wireless vehicle mount starting system k. Labor/lodging/travel l. Supports/ bracing m. Spiral ductwork, rain cap and fittings n. Fan contractor overload disconnect 5hp o. Exhaust fan relay switch for starting exhaust fans r. Tail pipe modification s. All necessary mechanical installation and core drilling t. All necessary electrical connection u. All necessary ductwork and hardware v. All inbound freight