Specifications include, but are not limited to: •Provide current Aerial Photography of the Downtown area, from and including Wyatt Earp Blvd. to Vine St. and from and including 3rd Ave. to Central Ave. •Provide 3-4 concepts for a typical block including the intersection. Each Concept will involve different theming. •Provide photographs or images of possible site elements to be included as part of the streetscape. This shall include but not limited to benches, trash receptacles, lighting, planters, signage, plant materials, trees grate/wells, etc. It is the City’s desire to follow some of the same elements that have been used in the new South Front Street Parking Lot and Santa Fe Depot. •Attend 1 or 2 meetings with City Staff to determine the overall direction for the streetscape concept. •Attend 3 to 4 meetings with the downtown stakeholders, public, and City staff to gather input for the final streetscape concept. •Develop a final street scape concept based on the input gathered from the meeting.