Specifications include, but are not limited to: The work to be performed consists of providing all the necessary materials and labor for the installation of a septic system at the Norton Wildlife Area. It will be hooked up to PVC piping already installed in a new storage shed constructed in 2017; The system will consist of: -!,000 gallon low profile fiberglass tank -The tank will be placed on at least 3 inches of sand or pea gravel -188 feet of laterals split into 4-47 foot runs, schedule 85 piping Or -4 chambers 36 inches wide by 4 foot long -Clean outs at the front and rear of the tank and at the end of each lateral -Risers to bring the lid of the septic even with the ground -A distribution box between the tank and drainage field -It will need to cross a waterline and needs all the safety precautions and materials to cross.