Specifications include, but are not limited to: For consideration, all bid responses must include: 1. Removal of all existing wood, leaving the existing metal-frame posts intact. 2. Restoration of existing structure to its original condition, including all necessary wood and hardware, including: a. Sixteen (16) 2”x 10” pieces of 10’ treated lumber b. Eight (8) 2”x 10” pieces of 12’ treated lumber c. Twenty-eight (28) 2”x 8” pieces of 10’ smooth cedar d. Ninety-six (96) 2” x 6” pieces of 10’ smooth cedar e. Forty-eight (48) 2” x 6” pieces of 14’ smooth cedar f. Eighty (80) total linear feet of 2” x 8” pieces of smooth cedar for bracing g. Three hundred sixty-eight (368) total linear feet of 2” x 6” pieces of smooth cedar for bracing h. Forty-eight (48) bolts measuring 10” long by ½” wide i. One hundred (100) ½-inch washers j. Forty-eight (48) ½-inch nuts k. Two hundred-fifty (250) hurricane clips l. All nails and additional hardware m. Dumpster n. Scaffolding o. Labor p. Retain all existing electrical connections and light fixtures Any proposed modifications and/or substitutions to the minimum requirements must be discussed with the project manager and issued as an addendum to other potential vendors in advance of the bid closing.