Specifications include, but are not limited to: a.Providing a full service program for controlling hydrogen sulfide concentrations measured at the GSPS Bell Mouth, the Plant One Clarifier, Plant Two Headworks, and the Plant Three Headworks utilizing the PRI-SC process (or approved equal). The odor control package shall be delivered as a full service program. b.See Figures 1 and 2 for the proposed location of the chemical feed sites and hydrogen sulfide monitoring location(s). c.PRI-SC is a patented process, as described in US Patent No. 6,773,604 d.B2 and 7,147,783 e.Any proposal that does not include the license to practice PRI-SC will not be accepted. f.Providing ferrous chloride dosing systems at Treatco, 33rd Street and Ohio, 31st and Glenn, Southlakes Park, and the Main Pump Station (or suitable alternate locations). g.Providing a hydrogen peroxide dosing system at the Plant One Pump Station, Tyler Pump Station, and Plant Two. h.Providing an additional hydrogen peroxide dosing system for odor control upstream of Plant One Pump Station at a site determined by the City. i.Providing (3) hydrogen peroxide chemical storage tanks, chemical feed pumps, remote monitoring and control systems, and related appurtenances to provide the required chemical dosing rates.