Specifications include, but are not limited to: 1. Its 161kV Transmission System (known as the “NERC Compliance Plan”); i.e., those rights of way and utility easements whose locations and sizes are shown in the Attachments to Proposal. 2. Its 69kV Sub-transmission System (known as the “69kV Sub-transmission Circuits Vegetation Management Plan”); i.e., those rights of way and utility easements whose locations and sizes are shown in the Attachments to Proposal. 3. Its 15kV Distribution System Plan (known as the “15kV and Secondary Distribution Vegetation Management Plan”), which will be carried out in a planned six (3) year cycle, as planned and presented annually to the Contractor prior to each anticipated Contract season.