Loading...
Skip to main content
< Back to results

Installation of Fiber Optic Cable and Equipment


Location
Kansas
Publication Date
06/27/2019 12:42 PM EDT
Closing Date
07/19/2019 11:00 AM EDT
Issuing Organization
City of Wichita
Solicitation Number
Description

Specifications include, but are not limited to: Fiber Path 1 – Directional Bore Fiber across Harry Bridge at McLean Blvd.  Directional bore across Harry, pull back a 3” HDPE conduit  Minimum Depth 6’  Install (1) new in-ground quazite box on the north and south side of Harry, east of McLean (36”Lx36”Wx24”D) Fiber Path 2 – Directional Bore under Arkansas River Central Maintenance Facility to Greenway Blvd  Directional bore across the Arkansas river, install 1 - 6” a steel conduit  Install new in-ground quazite box on the south side of Harry St Bridge to the west of Greenway Blvd (36”Lx36”Wx24”D)  Install Futurepath Hybrid 6-way (See Attachment D) inside 6” steel Conduit From existing Fiber Pull box to New Quazite box at Greenway Blvd (Approx. 50” South of the Harry Street Bridge in order to clear construction.)

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids