Specifications include, but are not limited to: Fiber Path 1 – Directional Bore Fiber across Harry Bridge at McLean Blvd. Directional bore across Harry, pull back a 3” HDPE conduit Minimum Depth 6’ Install (1) new in-ground quazite box on the north and south side of Harry, east of McLean (36”Lx36”Wx24”D) Fiber Path 2 – Directional Bore under Arkansas River Central Maintenance Facility to Greenway Blvd Directional bore across the Arkansas river, install 1 - 6” a steel conduit Install new in-ground quazite box on the south side of Harry St Bridge to the west of Greenway Blvd (36”Lx36”Wx24”D) Install Futurepath Hybrid 6-way (See Attachment D) inside 6” steel Conduit From existing Fiber Pull box to New Quazite box at Greenway Blvd (Approx. 50” South of the Harry Street Bridge in order to clear construction.)