Specifications include, but are not limited to: All existing water meters are to be replaced where water services are replaced or relocated. The new water meter shall be located in the same proximity as the existing water meter, where possible. The new water meters are to be set into the new 1” water meter setters using approved adapters, if needed. The Public Works & Utilities Department will provide the new 1” meters at no cost. All existing 5/8”, 3/4” and 1” water meters shall be replaced with new 1” water meters. Where an existing meter is found to have an ERT, the meter shall be reinstalled into the new 1” water service and the necessary water meter information shall be provided. The new water meters shall be provided by the Public Works & Utilities Department, at no cost to the Contractor. The new meters may be picked up at the Public Works & Utilities Department Maintenance warehouse at 1825 S. McLean Blvd.