Specifications include, but are not limited to: Base bid for phase 1 will consist of all Fire Sprinkler Systems to be installed in the Crisis cell, Breezeway and Infirmary. •We require all preparations for phase 2 that are located within the Crisis cell and Infirmary areas to be completed in phase 1. •Provide a quote based on attached drawings, specifications and schedules. The attached drawings are a full set, some are the drawings are for reference only. •All Workers are required to attend an 8-hour training course before working on-site. This training is available every other Thursday at our Facility. •All bidders are required to schedule a site visit to inspect the areas where the new system will connect to the existing fire sprinkler system. Drawing FP-1 and FP-2 show the existing system (reference only)