Specifications include, but are not limited to: Provide all design work, demolition, and construction for an addition to the Dodge City YMCA and a separate locker room to serve Cavalier Field. The addition shall be approximately 50’ x 155’ along the east side of the main YMCA building Current fitness center, locker room, and office area will be demolished. The addition to the YMCA shall be an engineered metal building with a roof line that matches the existing roof line in type, slope and color. A 20’ lean-to extension along the east side of the addition must be included for AFM equipment storage as an alternate. A separate locker room area shall be provided to service Cavalier field. The size of the locker room shall be approximately 480 sq ft. Contractor is responsible for the relocation of existing utilities to fitness center. There is an existing sanitary sewer main that will be under the proposed addition. The City is investigating options for relocation.