Specifications include, but are not limited to: This rehabilitation work includes Carpentry, Plumbing, Radon, Electrical, Painting (LBP), Foundation Repair, and Exterior Soil Grading. 1. Carpentry: *****Items Involve LBP A. Repair Chimney top and install rain cap over the complete Top of Chimney to prevent rain/snow from entering B. Seal edges of shingles around chimney tin and or valley to prevent water leakage into the home. C. Remove and dispose of basement family room cabinets for foundation stabilization. Confirm disposal with owner. D. Install Attic access door in attic opening in garage Carpentry Total: 2. Plumbing: Sump Pump to discharge a minimum of 6 ft. from house A. Install Sump Pump System. Plumbing firm to determine best placement. B. Adjust front sewer cleanouts as needed for final back fill. Plumbing Total: 3. Painting: Provide Color Selection *****Items Involve LBP A. Prep and re-paint all exterior wood components of the home to include exterior garage door and exterior side of the exterior passage doors, door frames and include window troughs. *****Items Involve LBP