Specifications include, but are not limited to: Work on this project consists of partial and full depth asphalt repair, thermal crack repair, concrete base repair, and curb and gutter repair, City-wide as directed by the Engineer. The cost shall include all the necessary work to complete the repairs such as pavement removal and compaction of sub-grade. All the asphalt used on this project shall be BM-2 (PG 64-22 max 35% RAP) for Base Course and BM-2 (PG 64-22 max 15% RAP) for Surface Course. Partial-depth Asphalt Repairs. Work consists of milling 2” to 4” of asphalt pavement thickness and replacing with 2” to 4” asphalt surface coarse. Depth of cut will be determined by the project inspector. Asphalt repairs shall be compacted to 95% density. The partial-depth asphalt repair shall be paid in tons of asphalt