Specifications include, but are not limited to: A. All work shall be performed in an efficient manner, and shall meet the highest standards for the type of service being performed. B. Cleaning processes are to be completed in such a manner that the surface will be streak-free. C. Work is to be scheduled between the hours of 8:00 A.M.-5:00 P.M. Monday through Friday. D. Personnel shall not place or use equipment in locations in such a manner as to create safety hazards. E. Personnel shall at all times provide, place and remove warning signs/barricades as needed. F. Contractor is responsible for training, education, and compliance with all current OSHA and current industry safety standards, for employees and subcontractors. G. Contractor will be responsible for protecting county property, including, but not limited to, all adjacent building surfaces, furniture, wall and floor coverings, and computer or electronic equipment in the vicinity of the window being cleaned. H. A payment bond equal to 100% of the bid cost is required if subcontractors are used.