Expanded Parking area at Maize South Middle School ● see attached aerial maps for work areas ● Timeline - All work must take place between June 2nd and July 31st. Silver Fox must be reopened for traffic no later than July 31st ● Approximately 162’ of new parking area (18 stalls) this can be flexible depending on site conditions. ● Bid should include any saw cutting and removal of any existing curb and haul off of any demo’d concrete. ● Remove existing dirt and replace with minimum 1-2” compacted base ● 5” thick concrete, 4000 PSI wire mesh reinforced with 4 gauge paving wire ● ½” rebar doweled into existing concrete ● Include cost for new sidewalk, match existing width, expansion joints are required ● Existing sprinkler heads will be relocated by district SilverFox Roundabout Improvements ● Refer to attached aerial for areas of work ● Bid should include any saw cutting and removal of any existing curb and haul off of any demo’d concrete. ● 6” thick concrete, 4000 PSI wire mesh reinforced with 4 gauge paving wire (or follow industry standard best practices) ● ½” rebar doweled into existing concrete Maize South Elementary School SPED drive ● Refer to attached aerial for areas of work ● Bid should include any saw cutting and removal of any existing curb and haul off of any demo’d concrete. ● 8” thick concrete on north side of drive, 6” on south side of drive, 4000 PSI wire mesh reinforced with 4 gauge paving wire (or follow industry standard best practices) ● ½” rebar doweled into existing ashpalt