• MODEL YEAR: 2024 OR NEWER • GENERAL NOTES: SELECT UNITS AT SITE ELEVATION OF 2,600 FT. ASL • ALL UNITS SELECTED FOR 0% GLYCOL SOLUTION • CONTRACTOR TO FIELD VERIFY (E)CONDENSATE RETURN MAIN VS FCU ELEVATION.PROVIDE CONDENSATE PUMP WHERE FCU IS BELOW CONDENSATE RETURN MAIN. • PROVIDE WITH UNIT MOUNTED DISCONNECT SWITCHES • PROVIDE MANUFACTURE PROVIDED FILTER BOX WITH MERV-8 FILTER WITH MERV-8 FILTER ON RETURN INTAKE. • CONTRACTOR SHALL FIELD VERIFY SCHEDULED UNIT STYLE MATCHES EXISTING PRIOR TO PROCUREMENT. • PROVIDE MANUFACTURE PIPING PACKAGE (ISOLATION VALVE, BALANCE VALVE, FLEX HOSE, STRAINER, ETC. • CONTRACTOR WILL COORDINATE WITH ELECTRICAL CONTRACTOR TO FIELD VERIFY REPLACEMENT FCU SCHEDULED VOLTAGES MATCH EXISTING MATCH EXISTING