Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 025324 1.000 LS TRAFFIC CONTROL / 4 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 5 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 6 020001 1.000 LS $8,000.000 $8,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART Section 01 Total $8,030.00 Section 02 ASPHALT SURFACING ITEMS 7 060242 23540.000 TON HMA OVERLAY (SR-12.5A) (PG 64-28) / 8 081699 23540.000 TON QUALITY CONTROL TESTING (HMA) / 9 083447 46.000 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H) / 10 081773 25400.000 TON MILLING / 11 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / 12 011750 1.000 EACH $1.000 $1.00 ASPHALT CORE (SET PRICE) / 13 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 14 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 15 070912 693.500 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / Section 02 Total $253.00 Section 03 RUMBLE STRIPS 16 032406 526.800 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) / 17 072252 1036.900 STA. RUMBLE STRIPS (MILLED) (ASPHALT) / Section 03 Total