Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 025324 1.000 LS TRAFFIC CONTROL / 3 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 4 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 5 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / Section 01 Total $4,030.00 Section 02 ASPHALT SURFACING ITEMS 6 060241 5954.000 TON HMA OVERLAY (SR-12.5A) (PG 70-28) / 7 060257 4531.000 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) / 8 081699 10485.000 TON QUALITY CONTROL TESTING (HMA) / 9 010256 20.000 TON EMULSIFIED ASPHALT (SS-1HP) / 10 012278 1944.000 TON HMA-COMMERCIAL GRADE (CLASS A) (PATCHING) / 11 081773 1956.000 TON MILLING / 12 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 13 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 14 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 15 081050 475.000 TON PAVEMENT EDGE WEDGE (ROCK) / 16 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / 17 070912 94.000 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / Section 02 Total $92.00 Section 03 RUMBLE STRIPS 18 032406 94.000 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) /