• The 2” Mill and Overlay approximately 5,018 FT² +/- of existing asphalt paving at the WaterOne Kansas River Presed. • The 2” Mill and Overlay approximately 600 FT² +/- of existing asphalt paving at the WaterOne Wolcott Surge Tank. • The 2” Mill and Overlay approximately 81,366 FT² +/- of existing asphalt paving at the WaterOne Missouri River Presed. • Full depth replacement of approximately 1,380 FT² +/- of existing asphalt paving at the WaterOne Missouri River Presed, (may include subgrade remediation). • Removal and Replacement of approximately 600 LF +/- of concrete curb at the WaterOne Missouri River Presed. • The removal and replacement of approximately 10’ of existing curb, the addition/extension of approximately 30’ of 12” retaining wall including the addition of 30’ corresponding curb at the Missouri River Presed, Basin No. 4. • Unforeseen repairs including but not limited to irrigation and landscaping etc.