Designed improvements will include 2” milling and asphalt resurfacing, asphalt base repairs (as needed), spot concrete curb and gutter replacement , sidewalk widening on the east side (8’-10’ width), ADA ramps, polymer overlay of bridge, stormwater improvements, signal detection and pavement markings. This project may also include bridge deck repairs. Design services will include survey of existing conditions, utility coordination, acquisition documentation (title reports, surveyed exhibits, easement documents, etc.) needed for any right-of-way or easements, developing construction plans in accordance with Olathe design standards and specifications, cost estimates, assistance with bidding of projects for construction and assistance as needed throughout construction.