Section 01 COMMON ITEMS 1 020100 1.000 LS CONTRACTOR CONSTRUCTION STAKING / 2 025323 1.000 LS MOBILIZATION / 3 070626 1.000 LS MOBILIZATION (DBE) / 4 025200 1.000 LS REMOVAL OF EXISTING STRUCTURES / 5 055660 1640.000 HOUR $2.000 $3,280.00 TRAINEES HIGHWAY CONSTRUCTION (SET PRICE) / NON PART 6 040707 1.000 LS CURING ENVIRONMENT / Section 01 Total $3,280.00 Section 02 ROAD ITEMS 7 011772 1.000 LS TRANSPORTING SALVAGEABLE MATERIAL / NON PART 8 025361 1.000 LS CLEARING AND GRUBBING / 9 012412 39.000 CUYD COMMON EXCAVATION (URB) / 10 012415 406.000 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 11 012420 311.000 CUYD ROCK EXCAVATION / 12 012317 351.000 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 13 030189 1530.000 SQYD SALVAGED TOPSOIL / 14 010114 1.000 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 15 023456 200.000 LNFT GUARDRAIL, STEEL PLATE (MGS) / 16 012281 190.000 LNFT SLOPE DRAIN (STONE) / 17 012711 3.000 EACH FLUME INLET (CONCRETE) / 18 030700 0.600 PMPS MOWING / 19 081459 64.000 TON SURFACING MATERIAL (SA-1) / 20 025007 1.000 EACH $200.000 $200.00 TOWING (COURTESY) (SET PRICE) / Section 02 Total $240.00