Projects may include, but are not limited to, repair of channels, construction or rehabilitation of structural Best Management Practices (BMPs) to improve water quality in the City’s rivers and streams, and construction of small-scale Drainage Correction Projects (DCPs) – individual project budgets of less than $100,000.00 that affect at least 3 private properties - at various times and places as called for and directed by the Stormwater Utility Engineer or his representative. Work includes, but is not limited to, earthwork, tree and brush removal, installation of stormwater pipe, and placement of concrete, riprap, gabions, and other erosion control devices. Contractor is responsible for utility locates. Contractor will order material on most projects.