Specifications include, but are not limited to: he work to be accomplished on this project consists of design services for construction of a concrete walk meeting specifications listed. • Continuation of existing Deer Creek Trail from approximately SW 10th Street and Deer Creek Parkway south along SE Carnahan Ave to 21st Street then along Deer Creek through private property and public parklands known as Dornwood Park. • Concrete walk, multiple bridge designs, trail signage and other flat work as needed. • Concrete - Ten feet (10’) width, five inches (5”) depth, medium broom finish • On all walks a control joint shall be tooled or saw-cut every 8’. Pads larger than 10’ square shall be have control joints as needed. An expansion joint material shall be placed wherever the walk abuts existing concrete and at T intersections. All edges shall have a tooled finish. Side slope of the trail shall not exceed 2%. • The design shall preserve as much as possible the tree canopy and natural surroundings within the planned zone.