The scope of work includes the removal and replacement of existing ADAcompliant ramps at four different locations in Southwestern part of the city. Refer to the attached exhibits for general project locations & limits of construction. The primary objective of this project is to enhance ramp performance to improve pedestrian safety. The approximate bid quantities of the project are:1 Combined Curb & Gutter, (Type varies) 340.00 L.F; 2 Remove & Reset Bricks on Ramps & Crosswalk 600.00 S.F; 3 4" Concrete Sidewalk 480.00 S.F; 4 4" Concrete Sidewalk with Edge Curb 500.00 S.F; 5 6" Concrete Sidewalk Ramp 360.00 S.F; 6 Aggregate Base (Type - AB3) 63.40 Ton; 7 Asphalt Pavement Patching (2") 4.20 Ton; 8 Seeding, Fertilizing and Mulch 0.10 ACRE; 9 Inlet Protection 5.00 Each; 10 Traffic Control 1.00 LS