Specifications include, but are not limited to: 6. The Owner has 285 existing NHS bridges requiring a Routine Inspection. 13 structures have a scour report. The Item 113 Justification Form for each of the 13 structures shall be reviewed and updated as needed. Underwater inspections that may be required for any structures will be performed by KDOT and is not included in the scope of these inspections. 7. The Owner has 63 structures of less than 20’ length consisting mainly of single-cell and multiple-cell reinforced concrete box culverts requiring a Routine Inspection. A detailed list is provided in Attachment 1. 8. The Owner has 2 pedestrian cable-stayed bridges at the Keeper of the Plains requiring an In-Depth Inspection. Inspections are to be done according to NBIS standards for In-Depth Inspections as well as following the scope of services in Attachment 2. The Owner has an option to utilize the Engineer of Record to perform this Inspection and reserves the right to select the Engineer of Record and not the Consultant. See attachment 2 for details and additional requirements. 9. The Owner has 38 non-NHS pedestrian bridges requiring a Routine Inspection. Inspections are to be done from ground and/or bridge deck level according to NBIS standards for Routine Inspections. Results of the pedestrian bridge inspections are not required to be input into the KDOT Bridge Inspection Portal. A detailed list is provided in Attachment 3. 10. The Owner has approximately 611 signalized intersections with approximately 2100 poles. Inspections are to be done from ground and aerial level following the scope of services in Attachment 4. A detailed list of locations shall be provided to the Consultant at the time of award. Scope for this inspection shall be determined based on proposals and whether the Owner decides to move forward with inspections at this time. 15. The standard KDOT BLP Bridge Inspection Form (BIF) shall be used to record the field inspection data. Critical Findings shall be recorded on the standard KDOT BLP Critical Inspection Findings (CIF) form. 16. Review inspection cycles for all bridges within contracted bridge group to verify the proper inspection cycles have been set and followed. 17. Review scour analysis/assessment and scour plan of action information in the bridge folder, and report if the information is inadequate or needs updating. 18. Review load rating information in the bridge folder, and report if the information is inadequate or needs updating. 19. Review photographs in the bridge file; add any required photos that are not in the bridge folder. Provide new photographs of items as necessary to adequately document significant deficiencies, changed conditions, or repairs needed. Approach photographs should include the weight limit posting signs at each end of the bridge for all load posted bridges.