Dry Weather Pump Station upgrades: • New dry pit submersible dry weather pumps (3 duty /1 standby) • New valves, piping, and fittings • Re-route discharge for dry weather flood pump • Replace dry weather sump pumps • Replace flowmeter vault plug valve, flow meter, and installation of bypass connection • Replace existing dry weather screens with multi-rake bar screens and a screenings washer/compactor with service water used for sluicing. Wet Weather Pump Station upgrades: • New self-priming PEFTF drain pumps (1 duty / 1 standby) • New 24-in. wet weather pump discharge piping and valves • New axial flow wet weather pumps • New wet weather wetwell drain pumps and floor drain sump pumps. Facility Expansion and Code Compliance Improvements: • New Electrical Room • New Chemical Room • New Engine-Generator • Reclassification and separation of spaces • Bathroom addition • New Stairwells