1-1 1 LS Mobilization _________________________ /LS $_____________ $____________ 1-2 1 LS Removal of Existing structures and pipes ___________________________ /LS $_____________ $____________ 1-3 11 CY Rock Excavation ___________________________/CY $_____________ $____________ 1-4 62 SY Reinforced Concrete Pavement, 6” ___________________________ /SY $_____________ $____________ 1-5 69 SY Aggregate Base ___________________________/SY $_____________ $____________ 1-6 1 LS Grate Inlet (1.5’ x 3.0’) ___________________________/LS $_____________ $____________ 1-7 46 LF Edge Curb 6 » ___________________________/LF $_____________ $____________ 1-8 1 LS 2-cell, 2’x5’ precast RCB. ___________________________/LS $_____________ $____________ 1-9 1 LS Drainage Structure Transition Box ___________________________/LS $_____________ $____________ 1-10 75 SY Slope Protection 6 » ___________________________/LS $_____________ $____________ 1-11 1 LS All other work and materials required for The Beech Street Culvert replacement ___________________________/LS $_____________ $