Specifications include, but are not limited to: • Bidders to furnish all labor, materials and equipment. Locations have been identified by the State Fair’s Physical Plant Manager; a site visit to review the locations is required. • Asphalt shall not be relayed over wet subsurface; surface shall be dry and firm prior to placement. • Compact pavement by rolling. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment. • Develop rolling with consecutive passes to achieve even and smooth finish, without roller marks. • Clean-up will need to be daily upon completion of the work, contractor shall clean all areas affected by this portion of the contract to the owner’s satisfaction.