The work to be done consists of furnishing all plant, labor, equipment, and materials as well as performing all work in strict accordance with the drawings and specifications for Flexible Pavement Requirements and Miscellaneous Construction and Repairs at Fort Leavenworth, Kansas.
- 2” mill and overlay of Grant Avenue from Cody Road to Pope Ave.
- Install pavement markings. Refer to asphalt contract specifications.
- Provide traffic control as needed. A traffic control plan must be submitted to DPW for review and approval.
- One lane of traffic in each direction is to always remain open during construction. No construction is allowed between July 4, 2025 and July 6, and all lanes of traffic shall be open and operational during this window.
See attached Statement of Work (SOW)