The work consists of furnishing all plant, labor, equipment, and materials to perform all work in strict accordance with the plans and specification to perform all work in strict accordance with the plans and specification to demolish and replace the existing steam boiler and associated equipment in The USDB Prison’s E134 mechanical room. In addition to the steam boiler replacement, the work will also include the replacement of three corroded electrical panels (one 150A MCB and two 600A MLO) and one 45 kVA step-down transformer located in a boiler room. The existing equipment is deteriorating due to direct exposure to steam, chemicals and high humidity conditions. The replacement work will include furnishing and installing NEMA 4X-rated stainless steel equipment to mitigate environmental damage and comply with NEC 110.11 and 450.9. All work performed by the contractor shall result in a complete, functional system.