1) Hangar Exterior Repair a) Debris removal b) Tear Out and Replace approx. 168 LF, Gutter, Box, Galvanized Steel, 6" 2) Hangar Roof Repair a) Debris removal b) Tear out and replace approx. 77.40 SQ, Modified Bitumen Asphalt, SBS, Heat Applied, Granular Finish c) Replace missing lettering spelling out HUTCHINSON d) Tear out and replace approx. 7,400 SF, Insulation, Rigid, Fiberboard, 1/2" e) Tear out and replace approx. 320 LF, Drip Edge, Eave/Rake, Aluminum, PreFinished Color f) Tear out and replace 2 EA, Chimney Vent, Galvanized, Single Wall, 6" g) Tear out and replace 2 EA, Vent Cap, Furnace, Aluminum, 6" 3) Interior Hangar Repair a) Debris removal b) Tear out and replace approx. 1,000 SF, Insulation, Foam, Closed Cell, 1", Ceilings c) Tear out and replace approx. 400 SF, Insulation, Foam, Closed Cell, 1", Walls d) Reset / repair Tube Heater, Infrared, Single-Stage e) Reset, repair, or replace approx. 16 LF, Chimney Vent, Galvanized, Single Wall, 6"