The scope of work includes the removal and replacement of existing ADAcompliant ramps at three different locations in Southwestern part of the city. Refer to the attached exhibits for general project locations & limits of construction. The primary objective of this project is to enhance ramp performance to improve pedestrian safety. The approximate bid quantities of the project are: 1 4" Concrete Sidewalk (Width Varies) 2,000.00 SF; 2 6" Concrete Sidewalk Ramp 700.00 SF; 3 Concrete Valley Gutter 67.00 SY; 4 Concrete Curb & Gutter, (Type Varies) 360.00 LF; 5 6" Edge Curb 120.00 LF; 6 Aggregate Base (Type - AB3) 52.00 Ton; 7 Asphalt Pavement Patching (2") 20.00 Ton; 8 Inlet Protection 1.00 EA; 9 Seeding, Fertilizing and Mulch 0.10 AC; 10 Traffic Control 1.00 LS