A. ALL REQUIRED EXITS WILL REMAIN OPEN DURING THE DURATION OF THE PROJECT AND TO BE KEPT CLEAR OF EQUIPMENT, MATERIALS, DEBRIS ETC. B. ALL REQUIRED EXIT EGRESS WIDTHS WILL NOT BE DECREASED DURING THE DURATION OF THE PROJECT AND TO BE KEPT CLEAR OF EQUIPMENT, MATERIALS, DEBRIS ETC. C. REQUIRED TRAVEL DISTANCE BETWEEN FIRE EXTINGUISHERS WILL BE MAINTAINED AT ALL TIMES. THE CONTRACTOR WILL PROVIDE TEMPORARY FIRE EXTINGUISHERS WHICH ARE PROPERLY MARKED WHEN TRAVEL DISTANCE IS INTERRUPTED BY THE CONSTRUCTION PROCESS. D. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ANY EXISTING FIRE PROTECTION OR ALARM SYSTEM. THE CONTRACTOR WILL NOTIFY THE OWNER AND LOCAL FIRE OFFICIAL IN WRITING IF ANY PART OF THE FIRE PROTECTION OR FIRE ALARM SYSTEM IS TO BE INTERRUPTED. E. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROPERLY MARKING ANY AND ALL TEMPORARY EXITS. F. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING THE EMERGENCY EXITS SIGNAGE AND LIGHTING SYSTEM INCLUDING BUT NOT LIMITED TO TEMPORARY SIGNAGE AND LIGHTING AS REQUIRED BY CODE OR LOCAL BUILDING AND FIRE OFFICIALS. G. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE RESTORATION OF ANY RATED ASSEMBLY DISTURBED BY THE CONSTRUCTION PROCESS TO ITS ORIGINAL INTEGRITY. H. PER NFPA 101 CH 43, ONLY THE ALTERED/RENEWED SECTIONS OF THE PROJECT ARE REQUIRED TO MEET THE APPLICABLE SECTIONS OF THE CODE. THE ANALYSIS THEREFORE ONLY COVERS THE AREA IMPACTED BY THE RENEWAL OF THE BUILDING. ALL TRAVEL DISTANCES ARE MEASURED WITHIN PROJECT BOUNDARIES AND CONCLUDE AT TH EXISTING EXIT ACCESS CORRIDORS OR EXITS OUTSIDE THE SCOPE OF WORK OF THIS PROJECT. THESE EXIT ACCESS CORRIDORS AND EXITS ARE ASSUMED TO BE CODE COMPLIANT. I. EMERGENCY LIGHTING SHALL BE PROVIDED BY OTHERS. J. IF BIDDING CONTRACTOR HAS ANY DESIGN QUESTIONS DURING THE BIDDING PROCESS, QUESTIONS CAN BE SUBMITTED TO THE ENGINEER/OWNER TO RESOLVE IN THE FIELD PRIOR TO SUBMITTING FINAL BID.