This project consists of approximately 370 linear feet of curb and gutter removal and replacement, 1,870 square feet of sidewalk replacement, and 6,760 square feet of driveway approaches and apron reconstruction. All concrete work shall utilize KCMMB 4K concrete, except for three designated driveway approach and apron locations, which shall require KCMMB 4K concrete modified with a 24-hour high-early strength additive to allow reopening to traffic within 24 hours of placement. Work shall be completed as specified below and in the specifications and requirements. The contractor shall be responsible for all traffic control, temporary detours if required, signage as necessary, and public notification (24-48 hours).