Specifications include, but are not limited to: 2019 Outsourced Pavement Preservation Program CIP Ultrathin Bonded Overlay (Various Locations). The milling shall consist of using a cold milling machine at least six (6) foot in width. All areas that are edge milled shall transition from 5/8” to 0” in the 6 feet. This will include milling along the outside curb line, medians, and drive entrances. The drive entrances shall transition from 5/8” to 0” in 50’ on either side of the entrance. Transition milling will take place at the beginning and end of the project limits and abutting bridges and intersections. The transition milling shall transition from 5/8” to 0” in the 20 feet. All work for milling will be subsidiary with the bid item “Cold Milling”.