Specifications include, but are not limited to: 1. Deconstruction of current sculpture at current location. a. Includes moving pieces of each of the 4 qty. sculptural elements to nearby, on-site, parking lot (nearest flat location), to verify accurate measurements for footing spacing. b. Includes deconstruction sculpture and loading it on trailer to be transported to restoration subcontractor. 2. Restoration of the sculpture. a. Includes required repairs to the spun aluminum tubes b. Repair/replacement of end cap pieces due to corrosion/weathering. 3. Fabrication of sculpture connection components with shop drawings for review/approval. a. Structural engineer will provide required dimensions for components. b. Includes fabrication of aluminum support insert that fits within the sculpture tube. c. Includes fabrication of clevis and flange to connect to support insert to top of concrete column. d. Replacement of braided cables. e. All anchor bolts, set screws, and clevis pins, as specified by structural engineer