Specifications include, but are not limited to: ll items listed in this Section are Bid Specifications. A successful Bidder must be able to satisfy all these specifications to be deemed a Responsible Bidder. Bidder will provide containers on an as needed basis to the designated areas. Containers must be clearly labeled to distinguish ownership. Bidder must also accept delivered scrap to Bidders location. Bidder is responsible for inspecting the contents of the containers for unacceptable material before removing the container. Bidder will assume ownership, control, and responsibility of any material removed form location. Bidder will not hold the State of Iowa responsible for damage done to containers during the loading of scrap metal or moving of containers. Bidder will perform the service specified in such a manner as not to interrupt or interfere with the operation of any activity on the premises. Pricing will be determined by the set of monthly cost accordingly to the local mills. Bidder will pick up scrap materials with in three business days of notification from Agency. Bidder will determine the net weight of the scrap material. A copy of the dated weigh bill will accompany payment. Bidder will also supply a current month rates from the local mill.